1·Therefore, it is fit for a small hydro power station with low head and load.
该机型适用于水头和负荷变化比较大的水电站。
2·This paper briefly describes the technology for reinforcing the dam gate abutments of Nan-River hydro power station by using pre-stressing anchor cables.
本文简要介绍了应用预应力锚索锚固南河水电站大坝闸墩的工艺技术。
3·This paper introduces rectifying running parameters for electrical hydraulic pressure governor of hydraulic turbine of middle and small hydro power station.
文中论述了中小型水电站水轮机电液调速器的试验参数整定。
4·Reasonable evaluation has been made to the whole performance and technical index of speed governor of Unit no. 0, Ankang Hydro Power Station based on related test and analysis.
通过对安康水电厂0号机组调速器有关试验的测试与分析,对该调速器的整体性能及技术指标作出合理评价。
5·The application range of simulation technique in power system is very wide, from simulating thermal power plant, hydro power station, substation to simulating complete power network.
仿真技术在电力系统中的应用范围是很广的,从火电厂、水电站、变电站的仿真到整个电力系统的仿真。
6·This paper presents a better calculation approach of peak-valley electric energy for accurately evaluating economic-effectiveness of small hydro-power station in order to raise the design quality.
为了正确评价小水电站的经济性,提高其设计质量,提出了一种较好的峰谷电量计算方法。
7·It is the largest hydro-electric power station and dam in the world and has cost more than any other construction project in history.
它是世界上最大的水电站,比历史上任何工程都要耗资巨大。
8·In design of pumped storage station or high water head hydro-power station, it is important to evaluate the rock infiltration properties under practical water pressure.
在高水头电站、抽水蓄能电站设计中,需要查明岩体在实际水头作用下的透水率、渗透特性。
9·The technical innovation for installation works of ALSTOM 700 MW hydro-generating units of TGP's Left-bank Power Station is described.
介绍了三峡左岸电站ALSTOM 700 MW水轮发电机组安装工作中的技术革新。
10·In the first chapter, the general situation of telecontrol of hydro-power station and actuality of telecontrol protocol are introduced.
本文在第一章中介绍了水电厂远动的基本概况和远动规约的现状。